Sample project · Pergel Hassas İşleme is a fictional company. Made by Liman Studio.

A part on the tilting rotary table of a 5-axis machine, cut under coolant.
Illustrative image

Sample case study: the customer and figures are fictional.

Challenge

A hydraulic system maker in Germany had its manifold machined in three separate setups. The reference lost between setups caused position errors at intersecting holes and parts that failed the leak test.

Solution

We moved the block to one setup on a 5-axis machining centre with a purpose-built fixture. Angled holes were cut in one program, and the first part was fully measured on the coordinate measuring machine.

Burr checks at intersections were added to the control plan as a process step.

Result

Setups went from three to one, and cycle time dropped from 46 to 29 minutes. Leak-test rejects fell from 4.1% to 0.5%, and lead time shortened from six weeks to three.

Before and after

Hydraulic manifold: from three setups to one
MeasureBeforeAfter
Setups31
Cycle time46 min29 min
Leak-test rejects4.1%0.5%
Lead time6 weeks3 weeks

All case studies

Have a drawing?

Send it with the quantity you need. We check manufacturability and quote complete drawings within 2 working days.